By the time the house is on display in October 2009, Virginia Tech will have been working on the design and building of the 2009 house for almost two years! Follow the progress below.

JULY 2009

july 2009 | installing glass panes
  • Sheathed bathroom core
  • Installed pockets for bedroom sliding glass
  • Sliding glass doors installed
  • Blocking for cladding installed
  • Unirack frame installed for PV support
  • PV panels installed